File Info | Description |
---|---|
File Size: | 981 bytes |
File Modification Date/Time: | 2019:12:29 19:42:50+00:00 |
✻ Portions of file data provided by Exiftool (Phil Harvey) distributed under the Perl Artistic License.
Last Updated: 12/12/2024[Time to Read: ~3-5 minutes]
controller_change_order.xml uses the XML file extension, which is more specifically known as a Extensible Markup Language file. It is classified as a Data (Extensible Markup Language) file, created for Steam API v018 by Valve.
controller_change_order.xml was first released in the Windows 10 Operating System on 11/05/2014 with Steam API v018. This file release marks the latest and most updated version from Valve.
Please see below for more detailed information, XML file troubleshooting instructions, and free downloads of different versions of controller_change_order.xml.
File Analysis Provided by Jason Geater (Author)
Recommended Download: Fix controller_change_order.xml / Steam-related registry issues with WinThruster.
Compatible with Windows 11, 10, 8, 7, Vista, XP and 2000
Optional Offer for WinThruster by Solvusoft
| EULA | Privacy Policy | Terms | Uninstall
General Information ✻ | |
---|---|
File Name: | controller_change_order.xml |
File Extension: | XML file extension |
File Type: | Data |
Description: | Extensible Markup Language |
User Popularity Rating: |
Developer and Software Information | |
---|---|
Software Program: | Steam API v018 |
Developer: | Valve |
Software: | Steam |
Software Version: | API v018 |
File Details | |
---|---|
File Size (Bytes): | 981 |
Oldest File Date: | 12/29/2019 |
Latest File Date: | 12/29/2019 |
controller_change_order.xml file errors often occur during the startup phase of Steam, but can also occur while the program is running. These types XML errors are also known as “runtime errors” because they occur while Steam is running. Here are some of the most common controller_change_order.xml runtime errors:
Runtime Error!
Program: C:\Program Files (x86)\Steam\tenfoot\resource\layout\library\controller_change_order.xml
This application has requested the Runtime to terminate it in an unusual way.
Please contact the application's support team for more information.
Most XML errors are due to missing or corrupt files. Your controller_change_order.xml file could be missing due to accidental deletion, uninstalled as a shared file of another program (shared with Steam), or deleted by a malware infection. Furthermore, controller_change_order.xml file corruption could be caused from a power outage when loading Steam, system crash while loading or saving controller_change_order.xml, bad sectors on your storage media (usually your primary hard drive), or malware infection. Thus, it’s critical to make sure your anti-virus is kept up-to-date and scanning regularly.
If you're encountering one of the error messages above, follow these troubleshooting steps to resolve your controller_change_order.xml issue. These troubleshooting steps are listed in the recommended order of execution.
To begin System Restore (Windows XP, Vista, 7, 8, and 10):
If the Step 1 fails to resolve the controller_change_order.xml error, please proceed to the Step 2 below.
You can uninstall Steam software by following these instructions (Windows XP, Vista, 7, 8, and 10):
After the software has been fully uninstalled, restart your PC and reinstall Steam software.
If this Step 2 fails as well, please proceed to the Step 3 below.
Steam API v018
Valve
When the first two steps haven't solved your issue, it might be a good idea to run Windows Update. Many controller_change_order.xml error messages that are encountered can be contributed to an outdated Windows Operating System. To run Windows Update, please follow these easy steps:
If Windows Update failed to resolve the controller_change_order.xml error message, please proceed to next step. Please note that this final step is recommended for advanced PC users only.
If none of the previous three troubleshooting steps have resolved your issue, you can try a more aggressive approach (Note: Not recommended for amateur PC users) by downloading and replacing your appropriate controller_change_order.xml file version. We maintain a comprehensive database of 100% malware-free controller_change_order.xml files for every applicable version of Steam. Please follow the steps below to download and properly replace you file:
If this final step has failed and you're still encountering the error, you're only remaining option is to do a clean installation of Windows 10.
GEEK TIP : We must emphasize that reinstalling Windows will be a very time-consuming and advanced task to resolve controller_change_order.xml problems. To avoid data loss, you must be sure that you have backed-up all of your important documents, pictures, software installers, and other personal data before beginning the process. If you are not currently backing up your data, you need to do so immediately.
CAUTION : We strongly advise against downloading and copying controller_change_order.xml to your appropriate Windows system directory. Valve typically does not release Steam XML files for download because they are bundled together inside of a software installer. The installer's task is to ensure that all correct verifications have been made before installing and placing controller_change_order.xml and all other XML files for Steam. An incorrectly installed XML file may create system instability and could cause your program or operating system to stop functioning altogether. Proceed with caution.
File Name | Description | Software Program (Version) | File Size (bytes) | File Location |
---|---|---|---|---|
invitetolobby.xml | Extensible Markup Language | Steam API v018 | 1086 | C:\Windows\Prefetch\ |
friends_new.xml | Extensible Markup Language | Steam API v018 | 4634 | C:\Windows\Prefetch\ |
downloads_listitem.xml | Extensible Markup Language | Steam API v018 | 1104 | C:\Windows\Prefetch\ |
checkout_microtxnauth.xml | Extensible Markup Language | Steam API v018 | 2777 | C:\Windows\Prefetch\ |
controller_sourcemode_... | Extensible Markup Language | Steam API v018 | 10140 | C:\Windows\Prefetch\ |
File Name | Description | Software Program (Version) | File Size (bytes) | File Location |
---|---|---|---|---|
api-ms-win-core-profil... | ApiSet Stub DLL | Microsoft® Windows® Operating System (10.0.17134.12) | 10600 | C:\Users\Tester\AppData\Local\Microsoft\OneDriv... |
api-ms-win-core-sysinf... | ApiSet Stub DLL | Microsoft® Windows® Operating System (10.0.17134.12) | 12136 | C:\Users\Tester\AppData\Local\Microsoft\OneDriv... |
diagwrn.xml | Extensible Markup Language | Steam API v018 | 5718 | C:\Windows\System32\Sysprep\Panther\ |
api-ms-win-core-synch-... | ApiSet Stub DLL | Microsoft® Windows® Operating System (10.0.18362.1) | 13264 | C:\Program Files (x86)\Steam\bin\cef\cef.win7x64\ |
EtwRTEventLog-System.etl | Microsoft Event Trace Log | Steam API v018 | 432 | C:\Windows\System32\LogFiles\WMI\RtBackup\ |
Optional Offer for WinThruster by Solvusoft | EULA | Privacy Policy | Terms | Uninstall
You are downloading trial software. The purchase of a one-year software subscription at the price of $29.97 USD is required to unlock all software features. Subscription auto-renews at the end of the term (Learn more). By clicking the "Start Download" button above and installing "Software", I acknowledge I have read and agree to the Solvusoft End User License Agreement and Privacy Policy.