Troubleshooting Policy.11.0.Microsoft.Office.Interop.MSProject.config: How To Guide (Free Download)

Last Updated: 12/18/2024
[Average Read Time: 4.5 minutes]

Configuration files such as Policy.11.0.Microsoft.Office.Interop.MSProject.config utilize the CONFIG file extension. This file is considered a XML (Configuration) file, and was first created by Microsoft for the Microsoft Office Project Professional 2010 14 software package.

Policy.11.0.Microsoft.Office.Interop.MSProject.config was first developed on 06/01/2018 for the Windows 10 Operating System in Microsoft Project Professional 2016 (64-Bit) 2016. The latest version update [v14] for Microsoft Office Project Professional 2010 was 14 released on 03/05/2011.

In this short article, you will discover detailed file information, steps for troubleshooting CONFIG file problems with Policy.11.0.Microsoft.Office.Interop.MSProject.config, and list of free downloads for every version that exists in our comprehensive file directory.

File Analysis Provided by Jason Geater (Author)


Recommended Download: Fix Policy.11.0.Microsoft.Office.Interop.MSProject.config / Microsoft Office Project Professional 2010-related registry issues with WinThruster.

Compatible with Windows 11, 10, 8, 7, Vista, XP and 2000

Average User Rating

 

Optional Offer for WinThruster by Solvusoft
| EULA | Privacy Policy | Terms | Uninstall


File Overview


General Information
File Name: Policy.11.0.Microsoft.Office.Interop.MSProject.config
File Extension: CONFIG file extension
File Type: Developer
Description: Configuration
MIME Type: application/xml
User Popularity Rating:
 
Developer and Software Information
Software Program: Microsoft Office Project Professional 2010 14
Developer: Microsoft
Software: Microsoft Office Project Professional 2010
Software Version: 14
File Details
File Size (Bytes): 906
Oldest File Date: 12/30/2019
Latest File Date: 02/15/2020


What are Policy.11.0.Microsoft.Office.Interop.MSProject.config Error Messages?


General Policy.11.0.Microsoft.Office.Interop.MSProject.config Runtime Errors

Policy.11.0.Microsoft.Office.Interop.MSProject.config file errors often occur during the startup phase of Microsoft Office Project Professional 2010, but can also occur while the program is running. These types CONFIG errors are also known as “runtime errors” because they occur while Microsoft Office Project Professional 2010 is running. Here are some of the most common Policy.11.0.Microsoft.Office.Interop.MSProject.config runtime errors:

Microsoft Visual C++ Runtime Library

Runtime Error!

Program: C:\Windows\assembly\GAC_MSIL\Policy.11.0.Microsoft.Office.Interop.MSProject\14.0.0.0__71e9bce111e9429c\Policy.11.0.Microsoft.Office.Interop.MSProject.config

This application has requested the Runtime to terminate it in an unusual way.
Please contact the application's support team for more information.


Most CONFIG errors are due to missing or corrupt files. Your Policy.11.0.Microsoft.Office.Interop.MSProject.config file could be missing due to accidental deletion, uninstalled as a shared file of another program (shared with Microsoft Office Project Professional 2010), or deleted by a malware infection. Furthermore, Policy.11.0.Microsoft.Office.Interop.MSProject.config file corruption could be caused from a power outage when loading Microsoft Office Project Professional 2010, system crash while loading or saving Policy.11.0.Microsoft.Office.Interop.MSProject.config, bad sectors on your storage media (usually your primary hard drive), or malware infection. Thus, it’s critical to make sure your anti-virus is kept up-to-date and scanning regularly.



How to Fix Policy.11.0.Microsoft.Office.Interop.MSProject.config Errors in 3 Steps (Time to complete: ~5-15 minutes)

If you're encountering one of the error messages above, follow these troubleshooting steps to resolve your Policy.11.0.Microsoft.Office.Interop.MSProject.config issue. These troubleshooting steps are listed in the recommended order of execution.


Step 1: Restore your PC back to the latest restore point, "snapshot", or backup image before error occurred.

To begin System Restore (Windows XP, Vista, 7, 8, and 10):

  1. Hit the Windows Start button
  2. When you see the search box, type "System Restore" and press "ENTER".
  3. In the search results, find and click System Restore.
  4. Please enter the administrator password (if applicable / prompted).
  5. Follow the steps in the System Restore Wizard to choose a relevant restore point.
  6. Restore your computer to that backup image.

If the Step 1 fails to resolve the Policy.11.0.Microsoft.Office.Interop.MSProject.config error, please proceed to the Step 2 below.

Step 2: If recently installed Microsoft Office Project Professional 2010 (or related software), uninstall then try reinstalling Microsoft Office Project Professional 2010 software.

You can uninstall Microsoft Office Project Professional 2010 software by following these instructions (Windows XP, Vista, 7, 8, and 10):

  1. Hit the Windows Start button
  2. In the search box, type "Uninstall" and press "ENTER".
  3. In the search results, find and click "Add or Remove Programs"
  4. Find the entry for Microsoft Office Project Professional 2010 14 and click "Uninstall"
  5. Follow the prompts for uninstallation.

After the software has been fully uninstalled, restart your PC and reinstall Microsoft Office Project Professional 2010 software.

If this Step 2 fails as well, please proceed to the Step 3 below.

Microsoft Office Project Professional 2010 14

Microsoft Corporation

Step 3: Perform a Windows Update.

When the first two steps haven't solved your issue, it might be a good idea to run Windows Update. Many Policy.11.0.Microsoft.Office.Interop.MSProject.config error messages that are encountered can be contributed to an outdated Windows Operating System. To run Windows Update, please follow these easy steps:

  1. Hit the Windows Start button
  2. In the search box, type "Update" and press "ENTER".
  3. In the Windows Update dialog box, click "Check for Updates" (or similar button depending on your Windows version)
  4. If updates are available for download, click "Install Updates".
  5. After the update is completed, restart your PC.

If Windows Update failed to resolve the Policy.11.0.Microsoft.Office.Interop.MSProject.config error message, please proceed to next step. Please note that this final step is recommended for advanced PC users only.



If Those Steps Fail: Download and Replace Your Policy.11.0.Microsoft.Office.Interop.MSProject.config File (Caution: Advanced)

If none of the previous three troubleshooting steps have resolved your issue, you can try a more aggressive approach (Note: Not recommended for amateur PC users) by downloading and replacing your appropriate Policy.11.0.Microsoft.Office.Interop.MSProject.config file version. We maintain a comprehensive database of 100% malware-free Policy.11.0.Microsoft.Office.Interop.MSProject.config files for every applicable version of Microsoft Office Project Professional 2010. Please follow the steps below to download and properly replace you file:

  1. Locate your Windows operating system version in the list of below "Download Policy.11.0.Microsoft.Office.Interop.MSProject.config Files".
  2. Click the appropriate "Download Now" button and download your Windows file version.
  3. Copy this file to the appropriate Microsoft Office Project Professional 2010 folder location:
    Windows 10: C:\Windows\assembly\GAC_MSIL\Policy.11.0.Microsoft.Office.Interop.MSProject\15.0.0.0__71e9bce111e9429c\
    Windows 10: C:\Windows\assembly\GAC_MSIL\Policy.11.0.Microsoft.Office.Interop.MSProject\14.0.0.0__71e9bce111e9429c\
    Windows 10: C:\Windows\assembly\GAC\Policy.11.0.Microsoft.Office.Interop.MSProject\12.0.0.0__71e9bce111e9429c\
  4. Restart your computer.

If this final step has failed and you're still encountering the error, you're only remaining option is to do a clean installation of Windows 10.


GEEK TIP : We must emphasize that reinstalling Windows will be a very time-consuming and advanced task to resolve Policy.11.0.Microsoft.Office.Interop.MSProject.config problems. To avoid data loss, you must be sure that you have backed-up all of your important documents, pictures, software installers, and other personal data before beginning the process. If you are not currently backing up your data, you need to do so immediately.



Download Policy.11.0.Microsoft.Office.Interop.MSProject.config Files (Malware-Tested 100% Clean)


CAUTION : We strongly advise against downloading and copying Policy.11.0.Microsoft.Office.Interop.MSProject.config to your appropriate Windows system directory. Microsoft typically does not release Microsoft Office Project Professional 2010 CONFIG files for download because they are bundled together inside of a software installer. The installer's task is to ensure that all correct verifications have been made before installing and placing Policy.11.0.Microsoft.Office.Interop.MSProject.config and all other CONFIG files for Microsoft Office Project Professional 2010. An incorrectly installed CONFIG file may create system instability and could cause your program or operating system to stop functioning altogether. Proceed with caution.

Windows 10


Files Related to Policy.11.0.Microsoft.Office.Interop.MSProject.config


CONFIG Files Related to Policy.11.0.Microsoft.Office.Interop.MSProject.config

File Name Description Software Program (Version) File Size (bytes) File Location
Policy.11.0.office.config Configuration Microsoft Office Project Professional 2010 14 850 C:\Users\Tester\AppData\Local\Microsoft\Windows...
Policy.12.0.Microsoft.... Configuration Microsoft Office Project Professional 2010 14 906 C:\Users\Tester\AppData\Local\Microsoft\Windows...
Policy.11.0.Microsoft.... Configuration Microsoft Office Project Professional 2010 14 906 C:\Users\Tester\AppData\Local\Microsoft\Windows...
Policy.12.0.Microsoft.... Configuration Microsoft Office Project Professional 2010 14 880 C:\Users\Tester\AppData\Local\Microsoft\Windows...
Policy.12.0.office.config Configuration Microsoft Office Project Professional 2010 14 850 C:\Users\Tester\AppData\Local\Microsoft\Windows...

Other Files Related to Policy.11.0.Microsoft.Office.Interop.MSProject.config

File Name Description Software Program (Version) File Size (bytes) File Location
OneX_v1.xsd XML Schema Definition Windows 8 5957 C:\Windows\L2Schemas\
OneX_v1.xsd XML Schema Definition Windows 10 5957 C:\Windows\L2Schemas\
WWAN_profile_v1.xsd XML Schema Definition Windows 10 6201 C:\Windows\L2Schemas\
WLANAP_profile_v1.xsd XML Schema Definition Windows 7 7504 C:\Windows\L2Schemas\
WLANAP_profile_v1.xsd XML Schema Definition Windows 8.1 7548 C:\Windows\L2Schemas\


RocketPC

Optional Offer for WinThruster by Solvusoft | EULA | Privacy Policy | Terms | Uninstall


Browse Other File Extensions in Alphabetical Order :   # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

You are downloading trial software. The purchase of a one-year software subscription at the price of $29.97 USD is required to unlock all software features. Subscription auto-renews at the end of the term (Learn more). By clicking the "Start Download" button above and installing "Software", I acknowledge I have read and agree to the Solvusoft End User License Agreement and Privacy Policy.